Ok, well its been a crazy hectic month between the day job, side jobs and trying to keep progress moving on the house addition before the cold weather really sets in!! But things are looking pretty good, the addition is all framed! The roof was a stressful project, cutting into the old roof to tie in the new roof and then get it all done before any big rain or snow storms, and mother nature worked with me pretty well, got it all sealed up before any nasty weather. The roof has the osb decking down and tar paper laid out and its all been covered with tarps for the winter, hopefully sometime in the spring I can finish the roof, getting cold and the materials are way out of my budget!
So now I'm on to getting the side walls sealed up with osb sheathing so that I can hopefully get it all enclosed and do some work inside this winter.
1st floor walls going up
setting 2nd floor floor joists
view on the 2nd floor, floor down and walls going up
View from the back, roof rafters almost all set
osb all down on the roof and tar paper
roof all tarped for the winter
2nd floor small back roof of old house that gets removed now that new roof is water tight
looking out to the addition from old house, standing in bedroom area, addition area to be 2 kids bedrooms on left and master bath and walk-in closets on right